Southeast Intersection Improvements: Project Overview

Project Locations:

  • Site 1: O’Donnell Street from S. Ponca Street to Interstate Avenue
  • Site 2: O’Donnell Street Cut-off at Interstate Avenue
  • Site 3: Boston Street from S. Ponca Street to Haven Street
  • Site 4: Boston Street & S. Clinton Street

Project Timeframe:

  • Construction for all four sites is expected to begin Fall 2012 with work concluding in Fall 2013

Project Scope:

The intersection enhancements have been designed to improve safety and capacity at key intersections within the Southeast Project Area. Specific improvements include the following:

  • Site 1: Widening to accommodate a dedicated right turn lane in the eastbound approach
  • Site 2: Full depth pavement reconstruction
  • Site 3: Widening and conversion of westbound right turn lane to a shared right-through lane
  • Site 4: Conversion of existing parking lane to a dedicated right turn lane in the eastbound approach; stormwater management enhancements and landscape beautification

Key Elements:

  • Roadway Resurfacing
  • ADA Pedestrian Ramp Improvements
  • Signalization Improvements

Roadway Construction:

  • Periodic lane closures
  • Possible parking restrictions
  • Digg This Post
  • Tweet This Post
  • Stumble This Post
  • Submit This Post To Delicious
  • Submit This Post To Reddit
  • Submit This Post To Mixx
Contact adrienne.barnes@baltimorecity.gov with questions about this website.